Maintenance, Calibration and Repairs
Periodic maintenance and calibration work are required in order to use TOYO SYSTEM’s products over the long term. TOYO SYSTEM undertakes paid maintenance, calibration work and repair work.
For any queries or confirmations, please call TOYO SYSTEM. USA, Inc. at Tel: +1-614-438-4192.
For any queries or confirmations, please call TOYO SYSTEM. USA, Inc. at Tel: +1-614-438-4192.
As of September 30, 2021
Mitteilung über das Ende der Instandhaltung unseres Testsystems für das Laden und Entladen „TOSCAT-3600-Serie“
Vielen Dank für Ihre fortgesetzte Nutzung unserer Produkte.
Zum 30. September 2021 stellen wir anlässlich des Herstellungsendes von Bauteilen die Produktion von Geräten der TOSCAT-3600-Serie (Spezifikation: -1 – 4.5 V, 6 A, 128 CH), die wir über 10 Jahre lang angeboten haben, ein.
Das Ende der Instandhaltung ist auf 5 Jahre nach der Produktionseinstellung des Produkts festgelegt.
(Je nach dem Lagerbestand von Ersatzteilen besteht auch vor dem Ablauf der Frist für das Ende der Instandhaltung die Möglichkeit, dass Wartungsanfragen nicht erfüllt werden können.) Nach dem Ablauf der Frist für das Ende der Instandhaltung können Wartungsanfragen möglicherweise nicht mehr erfüllt werden. Wir bitten um Ihr Verständnis.
Wir entschuldigen uns für Unannehmlichkeiten, die Ihnen im Rahmen der Produktionseinstellung entstehen.
Wir hoffen, dass Sie unserer TOSCAT-Serie auch weiterhin gewogen bleiben.
*Wenn Sie Fragen haben, wenden Sie sich bitte an unsere Qualitätssicherungsabteilung.
Übersicht über die TOSCAT-Produkte, die vom Ende der Instandhaltung betroffen sind
As of August 1, 2013
Information on the End of Maintenance for some charge-discharge test Systems
Thank you for selecting our products.
We launched our first designed charge-discharge test System in 1993, however, we have discontinued the production and sales of this old design system more than 10 years ago.
We have continued to provide support to avoid trouble to the customers who purchased this system, however the repair limit of equipment is 10 years from the end of production and it has become difficult to secure the maintenance parts.
We regret to announce that we are setting a certain period for the end of maintenance work on the equipment models stated below. Your understanding will be greatly appreciated.
We launched our first designed charge-discharge test System in 1993, however, we have discontinued the production and sales of this old design system more than 10 years ago.
We have continued to provide support to avoid trouble to the customers who purchased this system, however the repair limit of equipment is 10 years from the end of production and it has become difficult to secure the maintenance parts.
We regret to announce that we are setting a certain period for the end of maintenance work on the equipment models stated below. Your understanding will be greatly appreciated.
List of TOSCAT Products that will No Longer Receive Maintenance
* In addition to the products listed above, some other products that were supplied more than 10 years ago may not be able to receive repairs or calibration. We will confirm and address the details of each situation according to the contents of the failure.
As of February 15, 2013
Information on Replacement of UPS (Uninterrupted Power Supply) Batteries
Thank you for choosing our products.
This is information concerning replacement of UPS batteries (lead batteries) for PCs that are used in charge-discharge test systems. Rechargeable batteries have recently been in the news for various reasons, and batteries used in UPS are no exception. Attached is information on the battery replacement services from the UPS makers and the Battery Association of Japan. Please confirm the battery replacement timing and implement the necessary replacement work.
Click below for information on battery replacement
1. Mitsubishi Electric information “Timing of Storage Battery Replacement”
2. “Periodically Replace UPS Batteries” issued by the Japan Electrical Manufacturers’ Association and Battery Association of Japan
The following is an excerpt from the documents issued by the Japan Electrical Manufacturers’ Association and Battery Association of Japan:
“Using batteries past their replacement period can cause battery containers to crack and fluid to leak out, leading to occurrence of secondary disasters such as strange odor, smoke, fire etc. Please replace batteries before they reach the end of their service life.”
Reference URL: http://industrial.panasonic.com/www-data/pdf/ACD4000/ACD4000PJ9.pdf
This is information concerning replacement of UPS batteries (lead batteries) for PCs that are used in charge-discharge test systems. Rechargeable batteries have recently been in the news for various reasons, and batteries used in UPS are no exception. Attached is information on the battery replacement services from the UPS makers and the Battery Association of Japan. Please confirm the battery replacement timing and implement the necessary replacement work.
Click below for information on battery replacement
1. Mitsubishi Electric information “Timing of Storage Battery Replacement”
2. “Periodically Replace UPS Batteries” issued by the Japan Electrical Manufacturers’ Association and Battery Association of Japan
The following is an excerpt from the documents issued by the Japan Electrical Manufacturers’ Association and Battery Association of Japan:
“Using batteries past their replacement period can cause battery containers to crack and fluid to leak out, leading to occurrence of secondary disasters such as strange odor, smoke, fire etc. Please replace batteries before they reach the end of their service life.”
Reference URL: http://industrial.panasonic.com/www-data/pdf/ACD4000/ACD4000PJ9.pdf